Difference between revisions of "RoboCupMechanical2008"

From RoboJackets Wiki
Jump to navigation Jump to search
 
(13 intermediate revisions by 4 users not shown)
Line 1: Line 1:
This page houses the current [[RoboCup]] Mechanical efforts. The 2007 efforts can be found [[RoboCupMechanical2007 | here]]. All development work will be done in Autodesk Inventor 2008. How to use Inventor and get it can be found on the [[How to Guide Inventor | Inventor How to Guide]]. Inventor is also available on our CAD Machines in Tin.
+
This page houses the 2008 [[RoboCup]] Mechanical efforts. The 2007 efforts can be found [[RoboCupMechanical2007 | here]]. All development work will be done in Autodesk Inventor 2008. How to use Inventor and get it can be found on the [[How to Guide Inventor | Inventor How to Guide]]. Inventor is also available on our CAD Machines in Tin.
  
 
Mechanical team meets Tuesday 6-9pm with the general meeting at 7pm and 2-6pm on Sundays. More hours will be announced as deadlines approach.
 
Mechanical team meets Tuesday 6-9pm with the general meeting at 7pm and 2-6pm on Sundays. More hours will be announced as deadlines approach.
Line 6: Line 6:
  
 
==Systems==
 
==Systems==
* Drivetrain
+
: [[RC08-Components|System Components and Bill of Materials]]
** [[RC08Omni|Omni Wheels]]
+
===Drivetrain===
** [[RoboCup Drive Motors/Gears|Motors/Gearing]]
+
: [[RC08Omni|Omni Wheels]]
** [[RC08Drive Module|Drive Module]]
+
: [[RoboCup Drive Motors/Gears|Motors/Gearing]]
* Integration
+
: [[RC08Drive Module|Drive Module]]
** [[RC08Shell|Shell]]
+
===Integration===
** [[RC08Chassis|Chassis]]
+
: [[RC08Shell|Shell]]
* Ball Control
+
: [[RC08Chassis|Chassis]]
** [[RC08-Dribbler|Dribbler]]
+
===Ball Control===
** [[RC08-Kicker|Kicker]]
+
: [[RC08-Dribbler|Dribbler]]
** [[RC08-Chipper|Chipper]]
+
: [[RC08-Kicker|Kicker]]
*[[RC08METestRig|Test Rig]]
+
: [[RC08-Chipper|Chipper]]
 +
: [[RC08BallSens|Ball Sensor]]
 +
===Testing===
 +
: [[RC08METestRig|Test Rig]]
 +
: Slope
 +
: Impact Test
  
 
==Schedule==
 
==Schedule==
* deadline for completion of Everything Box - 11/30/07
+
* delivery of completed team of Robots 5/21/08
* completion of ONE DRIVING, COMPLETE robot - 1/7/08
 
  
 
==Specifications==
 
==Specifications==
Line 32: Line 36:
  
 
==Meetings==
 
==Meetings==
*9/6/07 - Update for new members, organized testing plan and ideas
+
 
*9/13/07 - Organized most of the required tests into one device that will be designed starting on monday when we get CAD computer's back in the TIN.
 
*9/20/07 - The Test Rig aka "The Everything Box" is being designed and components spec-ed out. The hunt continutes for the dribbler motor.
 
*9/24/07 - Everything Box still being designed, would like to start ordering parts on Monday 10/3/07. Idea generation started on the dribbler system such as suspension and damping systems
 
*9/27/07 - Test Rig nearing completion. Concepts of ball control system discussed as well as the use of solenoids or some other actuator for the kicker
 
*10/1/07 - A cheap treadmill is being looked at for the testing rig. Conceptual planning is being done on the ball control system. Throughout the week, different ideas for the profile of the dribbler will be made on the lathe and then tested.
 
** the shaft output of the dribbler bar must be 3mm in diameter to fit in the gear of the current dribbler
 
*10/4/04 - Dribbler prototypes designed and parts are being ordered to make it. The dribbler motor was chosen and is being ordered as well. Work still continues on the kicker and chipper actuation. Lets work some over fall break! yah...!
 
*10/11/07 - Dribbler prototype drawings made. Ball control system still in discussion.
 
*10/15/07 - Everything Box design done, parts ordered tomorrow. Drive modules nearing completion.
 
*10/18/07 - Everything Box is under construction
 
*10/22/07 - Everything Box is under construction, other parts are being designed
 
*10/25/07 - Everything Box design complete and parts are being fabricated
 
*10/29/07 - Everything Box still being fabricated
 
*11/1/07 - No Robocup meeting due to the Virginia Tech football game
 
*11/4/07 - No Robocup meeting. Everyone busy.
 
*11/7/07 - Mechanical and electrical components for Everything Box being fabricated.
 
*11/26/07 - Everything Box is nearly complete, as are the electronics for it. Electronic controls are also nearly done for to control the new drive motors - giving the CS team a platform to use for testing. The machining of a few parts will be outsourced to different suppliers.
 
*11/29/07 - Remainder of parts made, as well as some drawings of parts
 
*12/2/07 - Everything Box is done, dribbler is nearly finished, drawings still continue to be made to posted for outsourcing
 
*12/17/07 - After a break for finals work resumes. Majority of parts ordered for the prototype, design nearly complete - still a bit of tweaking remains. Carbon fiber is being researched for shell.
 
*12/18/07 - McMaster order picked up. Kicker solenoid spec-ed out, documentation of design continues.
 
*12/19/07 - Spring for the dribbler was designed and selected. position of drive modules will be moved. CAM software tested and g-code created for both drive module plates.
 
*12/20/07 - Machining has begun with the drive module inner and outer plates. Roller prototypes for the ominwheels were received and are being evaluated.
 
*12/26/07 - Drive module plates completed. Machining begun, slowly, on the omniwheel plates.
 
*12/28/07 - Omniwheel plates are complete. The omniwheel bodies arrived and a full omniwheel was assembled - its beautiful. Revisions were made to the rollers based on the wheel and will be sent out. Drive electronics for the Everything Box are being assembled.
 
*12/30/07 - The everything box finally has speed control to it. Dribbler parts were machined.
 
*1/2/08 - Kicker solenoid was decided upon, preliminary cost analysis performed.
 
*1/8/08 - Chipper simulation continues but solution is just about found, machining started on output drive shafts.
 
*1/9/08 - Many parts recieved and an output shaft was turned on the lathe. A few other parts have been fabricated.
 
*1/15/08 - Drive shafts are done, solenoids have been ordered, alternate supplier was found for drive gears to get them sooner. A game controller was connected to computers to control 2007 robots.
 
*1/21/08 - All parts have been lathed. Heat shrink was used for the 2007 dribbler very effectively for qualification
 
*1/22/08 - Bottom plate was machined, the kicking testing equipment has been started as well as the dribbler-incline test was nearly completed
 
*1/27/08 - G-code written for chipper parts. Dribbler gears were re-spec-ed out, discussion of TDP has begun, layout of the electrical board was decided to accomodate for the mechanical design
 
*1/29/08 - Dribbler incline test finished, more dribbler prototypes have been made to test material. Test stand made for EE team to test the solenoids.
 
*2/1/08 - Kicker mount and boot machined, drive modules completed, debugged, and fixed to the base. The omniwheels were driven for the first time and had a high amount of torque
 
*2/3/08 - Design of electrical plate completed
 
*2/5/08 - Good progress was made on Mech. TDP, a few 2007 robots were reassembled, all dribbler prototypes have been made and are ready for testing.
 
*2/10/08 - Work debugging 2007 robots for qualification
 
*2/12/08 - A part for the chipper was machined, TDP nearly finished, a robot was fixed to allow more qualification stuff begin.
 
*2/19/08 - All chipper parts have been fabricated, dribbler testing has restarted. Only the top plate remains for machining.
 
  
 
==Documentation==
 
==Documentation==
Line 89: Line 53:
 
* coefficient of static friction of golf ball on felt carpet - .66
 
* coefficient of static friction of golf ball on felt carpet - .66
 
** last two points from Cornell 2003 Mechanical Documentation
 
** last two points from Cornell 2003 Mechanical Documentation
 
==Parts==
 
*[[RC08-Components|System Components and Bill of Materials]]
 
  
 
==Prototype Notes==
 
==Prototype Notes==
 
*make drive module shaft out of stronger material to prevent bending
 
*make drive module shaft out of stronger material to prevent bending
 
*ground clearance needs to be increased to prevent the robot from rubbing on the carpet
 
*ground clearance needs to be increased to prevent the robot from rubbing on the carpet
*4mm holes on the dribbler assembly need to changed to .177" - clearance hole for a 8-32 screw
+
*4mm holes on the dribbler assembly need to changed to .177" - clearance hole for a 8-32 screw - ease of assembly, prevent burring of the dribbler shafts
 
*binding of the drive modules can be reduced by adjusting the position of the motor, using the tolerance of its mounting screws
 
*binding of the drive modules can be reduced by adjusting the position of the motor, using the tolerance of its mounting screws
 
*design plastic guide block so hole for chipper hinge is centered
 
*design plastic guide block so hole for chipper hinge is centered
 +
*dribbler motor plate needs to be wider and flush to the motor
 +
*M2x4mm screws need to be ordered for the dribbler motor
 +
*consider increasing diameter of dribbler roller to add strength to the piece
  
 
==Useful Links==
 
==Useful Links==
 
* [http://www.cis.cornell.edu/boom/2005/ProjectArchive/robocup/ Cornell Documents] (Look at 2003)
 
* [http://www.cis.cornell.edu/boom/2005/ProjectArchive/robocup/ Cornell Documents] (Look at 2003)
 
[[Category: RoboCup]] [[Category: 2008]]
 
  
 
* [ftp://ftp.itam.mx/pub/alfredo/PAPERS/SotoWeitzenfeld80LARS2006.pdf Eagle Knights Dribbler Testing]
 
* [ftp://ftp.itam.mx/pub/alfredo/PAPERS/SotoWeitzenfeld80LARS2006.pdf Eagle Knights Dribbler Testing]
 
[[Category: RoboCup]] [[Category: 2008]]
 
  
 
*[http://www.sdp-si.com/D220/D220cat.htm#T35 Mechanical Engineering Tips]
 
*[http://www.sdp-si.com/D220/D220cat.htm#T35 Mechanical Engineering Tips]
Line 122: Line 82:
  
 
*[http://thomasnet.com Global supplier and CAD drawing database]
 
*[http://thomasnet.com Global supplier and CAD drawing database]
 +
 +
[[Category: RC Mechanical]]
 +
[[Category: 2007-2008]]

Latest revision as of 20:40, 24 May 2020

This page houses the 2008 RoboCup Mechanical efforts. The 2007 efforts can be found here. All development work will be done in Autodesk Inventor 2008. How to use Inventor and get it can be found on the Inventor How to Guide. Inventor is also available on our CAD Machines in Tin.

Mechanical team meets Tuesday 6-9pm with the general meeting at 7pm and 2-6pm on Sundays. More hours will be announced as deadlines approach.

A developement rendering of a 2008 RoboCup robot

Systems

System Components and Bill of Materials

Drivetrain

Omni Wheels
Motors/Gearing
Drive Module

Integration

Shell
Chassis

Ball Control

Dribbler
Kicker
Chipper
Ball Sensor

Testing

Test Rig
Slope
Impact Test

Schedule

  • delivery of completed team of Robots 5/21/08

Specifications

  • maximum robot weight - 1.8 kg
  • ball speed after being kicked - 10 m/s
  • dribbler bar speed - 8000 rpm
  • compress time (time for dribbler to absorb ball's energy and compress) - .2 seconds
  • no more than 20% of the ball's area (seen from top view) may be occupied by the robot - a critical Robocup SSL Rule
    • see Ball sketch

Meetings

Documentation

Testing

RoboCup Testing

Quick Notes

  • field area 5 meters x 3.5 meters
  • max ball speed - 10 m/s
  • ball diameter - 43 mm
  • ball mass - 46 grams
  • 1 rpm = .105 rad/s
  • ball material - DuPont Surlyn Ionomer Dupont's Surlyn Page
  • coefficient of static friction of golf ball on felt carpet - .66
    • last two points from Cornell 2003 Mechanical Documentation

Prototype Notes

  • make drive module shaft out of stronger material to prevent bending
  • ground clearance needs to be increased to prevent the robot from rubbing on the carpet
  • 4mm holes on the dribbler assembly need to changed to .177" - clearance hole for a 8-32 screw - ease of assembly, prevent burring of the dribbler shafts
  • binding of the drive modules can be reduced by adjusting the position of the motor, using the tolerance of its mounting screws
  • design plastic guide block so hole for chipper hinge is centered
  • dribbler motor plate needs to be wider and flush to the motor
  • M2x4mm screws need to be ordered for the dribbler motor
  • consider increasing diameter of dribbler roller to add strength to the piece

Useful Links