As part of the RoboCup 2009 Mechanical, the kicker provides passing capabilities to the robots. It is part of the chipper / kicker assembly.

2009 RoboJackets RoboCup Kicker & Chipperl


Related Pages

Parts & Components

Amounts are based on per robot. Materials are in sizes for prototyping not lowest cost per amount.

Stock

Aluminum Kicker Plunger
Vendor - McMaster-Carr
Part No. - 8974K25
Cost - $12.37
Description - Multipurpose Aluminum (Alloy 6061), 7/16" Diam, 36"
Steel Kicker Plunger
Vendor - McMaster-Carr
Part No. - 9120K14
Cost - $7.96
Description - General-Purpose Low-Carbon Steel, 7/16" Diam, 36"
Rear Chipper Solenoid Mount
Vendor - McMaster-Carr
Part No. - 9120K14
Cost - $7.96
Description - General-Purpose Low-Carbon Steel, 7/16" Diam, 36"
Front Kicker Solenoid Mount
Vendor - McMaster-Carr
Part No. - 9120K14
Cost - $7.96
Description - General-Purpose Low-Carbon Steel, 7/16" Diam, 36"
Kicker Chipper Solenoid Mount
Vendor - McMaster-Carr
Part No. - 9246K51
Cost - $36.66
Description - Multipurpose Aluminum (Alloy 6061) 3/4" Thick, 8" X 8"


NOTE: 2.4in long by .247in tall by .302in deep 7075 Grade, #8 32threads/in(8-32)

Action Log

  1. 10/12/2008 - Solenoid inner core diameter for prototype selected.
  2. 03/04/2009 - Fabrication issues with quality control have been encountered in winding the solenoid.
  3. 03/13/2009 - Decision has been made to purchase more of last years solenoids and attempt in house modifications.
  4. 03/22/2009 - Initial concept completed.
  5. 04/04/2009 - Resizing adjustments made.
  6. 04/12/2009 - Kicker rev1 design completed.
  7. 10/25/2009 - First fully machineable chipper design completed. (rev8)
  8. 01/31/2010 - Prototype kicker and chipper OTS solenoids re selected and designs updated.
  9. 01/31/2010 - Hardware testing of new electrical mockup shows estimated speeds of 12 m/s with 2008 solenoids.
  10. 02/02/2010 - New solenoids ordered.
  11. 02/07/2010 - Chipper & Kicker assemblies updated.
  12. 03/25/2010 - Chipper variants assembled and tested. Variants non functional.
  13. 03/26/2010 - Redesign completed, separate test rig designed, and fabrication started.
  14. 03/27/2010 - Fabrication completed and device tested. Chipper working with a range of up to 13ft. Longer solenoid stroke need for better power transfer.
  15. 04/04/2010 - Design refinements conducted.