RoboCup: Redesign 2014-2015
Revision as of 02:43, 31 October 2014 by JonJones (talk | contribs) (JonJones moved page 2014-2015 Electrical System Redesign to RoboCup: Redesign 2014-2015: streamlining redesign pages for the 2014-2015 rebuild)
Phase I: Techanical Analysis
The first stage of the 2014-2015 RoboCup redesign involves brainstorming potential upgrades by researching new technologies/resources since the last revision. A parallel analysis of current robot bugs and potential enhancements is also done at this time. Outlined below is a listing of resources that the team used in it's brainstorming stage.