Difference between revisions of "FIRST Kickoff"
Jump to navigation
Jump to search
(→Broadcast @ 10 AM) |
|||
Line 35: | Line 35: | ||
* Scholarships | * Scholarships | ||
===Broadcast @ 10 AM=== | ===Broadcast @ 10 AM=== | ||
− | * | + | * Will be shown on GTCN channel 77 |
* [http://www.nasa.gov/multimedia/nasatv/digital.html#educator Information about receiving the broadcast] | * [http://www.nasa.gov/multimedia/nasatv/digital.html#educator Information about receiving the broadcast] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===Field Viewing @ 12 pm=== | ===Field Viewing @ 12 pm=== |
Revision as of 10:04, 25 November 2008
This page is for information and planning about the 2009 FIRST Kickoff to be held at Georgia Tech.
Contents
TODO
- Shipping Details
- Workshop Details
Dates
- Occurs on the first Saturday of January.
- 2009 date: January 3rd
Space
- Need to accommodate a minimum of 210 people (35 teams with 6 people per team) ... need more
- On average 250-300 people show up
- Current plan is to hold the whole event at the Ferst Center for the Arts.
- Space Sponsored by RIM@GT
- Directions
Food
Basic Agenda
Setup @ 7:30 AM
- Should aim to be done by 8 AM
Arrival @ 8:30 AM
- Sign-in (1)
- Direction Signage (Provided by Ferst Center)
- Food
Guest Speaker @ 9:30 AM
- TBA from RIM
- Bob Stargel (Georgia FIRST Advisory Board Chair/Judge Advisor, Kimberly-Clark Corporation)
Announcements
- Pre-Ship Scrimmage Feb 14th and 15th
- Kit pick-up, Missing parts, Field Elements, Workshops
- Introduce Georgia FIRST website
- Teams need to remain in touch with their sponsors
- Scholarships
Broadcast @ 10 AM
- Will be shown on GTCN channel 77
- Information about receiving the broadcast
Field Viewing @ 12 pm
- Field will be behind the stage
- Field size 26' x 26' plus
- Friday set-up need large cloak of invisibility
KOP
- Should be handed out at the same time as field viewing
- Could be delivered early
- Needs a place to be stored (securely)
- Arrives on several pallets
- Inventory when they arrive
Lunch
Brainstorming @ After lunch
Other Plans
Control System Demo
- After the kits are released, a kitbot robot will be built by RoboJackets to show off the control system.
Workshop
- See document
- Keep them tethered, no wireless
Nov 24th Meeting
- 450 ppl total
- 31 teams
- Kit delivery
- Getting the kits early
- Could be dropped off at TSRB
- Separate company could receive and ship kits.
- Broadcast - GTCN
- Make maps of where to pick up kits
- Google maps for foods
- Ask NI about tweakers
- Send out e-mail to campus asking for experienced FIRST volunteers