Difference between revisions of "RoboCupMechanicalDev2009"

From RoboJackets Wiki
Jump to navigation Jump to search
(Dribbler)
Line 1: Line 1:
 
This page houses our complete current development schedule and tasks.
 
This page houses our complete current development schedule and tasks.
 +
 +
 +
==Current To Do==
 +
===Drivetrain===
 +
# Investigate part failures and problems.
 +
#: Omni Wheels
 +
#:# O-ring retention on rollers.
 +
#:# Carpet collection by omni wheels.
 +
# Post wheel prototype to mfg.com
 +
# Omni wheel prototype (physical).
 +
# Prototype of new gear box (CAD).
 +
 +
===Ball Control===
 +
# New solenoid design
 +
# Order solenoid parts
 +
# Build prototype dribbler roller.
 +
# Build mold for pouring
 +
# Test pouring molds for various compounds.
  
 
==September 2009==
 
==September 2009==

Revision as of 22:27, 26 October 2008

This page houses our complete current development schedule and tasks.


Current To Do

Drivetrain

  1. Investigate part failures and problems.
    Omni Wheels
    1. O-ring retention on rollers.
    2. Carpet collection by omni wheels.
  2. Post wheel prototype to mfg.com
  3. Omni wheel prototype (physical).
  4. Prototype of new gear box (CAD).

Ball Control

  1. New solenoid design
  2. Order solenoid parts
  3. Build prototype dribbler roller.
  4. Build mold for pouring
  5. Test pouring molds for various compounds.

September 2009

  1. Briefing of new members on 08 mechanical system.
  2. Conduct a phased maintenance and overhaul on 2008 fleet. Two robots at a time. Starting with worst condition.
    1. Disassembly and Cleaning
    2. Modifying motor shafts by putting in holes for set screws.
  3. Investigate part failures and problems.
    Omni Wheels
    1. O-ring retention on rollers.
    2. Carpet collection by omni wheels.
  4. Getting members Autodesk Inventor 2009
  5. Identify and assign subteams / subsystems
    Dribbler
    Drivetrain (Omni Wheel & Gearboxes)
    Kicker
    Chipper
    Chassis & Integration

Drivetrain

  1. Procure appropriate carpet samples.
  2. Design & Build test rig. Jack up 1 robot w/ small bocks, restrain it, and run 1 wheel on samples.
  3. Compare with other teams omni rollers.
    RoboJackets 2008 RoboCup World Gallery
  4. Develop conclusions and recommendations based on tests conducted.
  5. Work with software team to get full movement performance metrics of last years robot.
  6. As a starting point for working with gears consult:
    2007 TE Session Slide on Power Transmission (Pages 6, 7, 13 & 14)
    Wikipedia's Page on Gears
    WM Berg's Technical PDF on Gears (very comprehensive 40 mb +)

Kicker

  1. Work with electrical team on custom solenoid design.
  2. Look at other teams for reference & inspiration.
    1. CMU (http://www.youtube.com/watch?v=uqLA8prsVhw)
  3. Compare last years design to other teams.
    RoboJackets 2008 RoboCup World Gallery

Chipper

  1. Work with electrical team on custom solenoid design.
  2. Look at other teams for reference & inspiration.
    1. CMDragons (CMU) (http://www.youtube.com/watch?v=uqLA8prsVhw)

Dribbler

  1. Work with software team to formulate a testing time line for last years dribblers and construct performance metrics.
  2. Compare last years with other teams dribblers.
    RoboJackets 2008 RoboCup World Gallery
  3. As a starting point for working with gears consult:
    2007 TE Session Slide on Power Transmission (Pages 6, 7, 13 & 14)
    Wikipedia's Page on Gears
    WM Berg's Technical PDF on Gears (very comprehensive 40 mb +)

October 2009

Deliverables

  1. Omni wheel prototype (physical).
  2. Prototype of new gear box (CAD).
  3. Dimensions of kicking solenoid.
    Width, Length, Diameter of shaft.
  4. Performance evaluation of dribbler.
    Compare & contrast segmented vs full.
    Formulate design recommendations

Drivetrain

Omni Wheel

  1. Find carpet samples.
  2. Test last years wheels on various carpet samples.
  3. Develop a prototype with design changes.
  4. Test Prototype

Gear Box

  1. Look at internal gears.
  2. Develop CAD prototype of a new gear box.
    Constraints
    • 5/16 Hex Shaft to mount wheel
    • 4 mm motor output shaft

Kicker & Chipper

  1. Start meeting with electrical team on solenoid design.
    Look at Magnetic field & Electromechanical solenoids.

Dribbler

  1. Test current dribbler
    Receiving a pass
    Getting a stationary ball
  2. Design & Fabricate 2 shafts
    Full length (Note already have)
    Segmented