Difference between revisions of "RoboCupMechanicalDev2009"
Jump to navigation
Jump to search
(→Dribbler) |
|||
Line 1: | Line 1: | ||
This page houses our complete current development schedule and tasks. | This page houses our complete current development schedule and tasks. | ||
+ | |||
+ | |||
+ | ==Current To Do== | ||
+ | ===Drivetrain=== | ||
+ | # Investigate part failures and problems. | ||
+ | #: Omni Wheels | ||
+ | #:# O-ring retention on rollers. | ||
+ | #:# Carpet collection by omni wheels. | ||
+ | # Post wheel prototype to mfg.com | ||
+ | # Omni wheel prototype (physical). | ||
+ | # Prototype of new gear box (CAD). | ||
+ | |||
+ | ===Ball Control=== | ||
+ | # New solenoid design | ||
+ | # Order solenoid parts | ||
+ | # Build prototype dribbler roller. | ||
+ | # Build mold for pouring | ||
+ | # Test pouring molds for various compounds. | ||
==September 2009== | ==September 2009== |
Revision as of 22:27, 26 October 2008
This page houses our complete current development schedule and tasks.
Contents
Current To Do
Drivetrain
- Investigate part failures and problems.
- Omni Wheels
- O-ring retention on rollers.
- Carpet collection by omni wheels.
- Omni Wheels
- Post wheel prototype to mfg.com
- Omni wheel prototype (physical).
- Prototype of new gear box (CAD).
Ball Control
- New solenoid design
- Order solenoid parts
- Build prototype dribbler roller.
- Build mold for pouring
- Test pouring molds for various compounds.
September 2009
- Briefing of new members on 08 mechanical system.
- Conduct a phased maintenance and overhaul on 2008 fleet. Two robots at a time. Starting with worst condition.
- Disassembly and Cleaning
- Modifying motor shafts by putting in holes for set screws.
- Investigate part failures and problems.
- Omni Wheels
- O-ring retention on rollers.
- Carpet collection by omni wheels.
- Omni Wheels
- Getting members Autodesk Inventor 2009
- Identify and assign subteams / subsystems
- Dribbler
- Drivetrain (Omni Wheel & Gearboxes)
- Kicker
- Chipper
- Chassis & Integration
Drivetrain
- Procure appropriate carpet samples.
- Design & Build test rig. Jack up 1 robot w/ small bocks, restrain it, and run 1 wheel on samples.
- Compare with other teams omni rollers.
- Develop conclusions and recommendations based on tests conducted.
- Work with software team to get full movement performance metrics of last years robot.
- As a starting point for working with gears consult:
- 2007 TE Session Slide on Power Transmission (Pages 6, 7, 13 & 14)
- Wikipedia's Page on Gears
- WM Berg's Technical PDF on Gears (very comprehensive 40 mb +)
Kicker
- Work with electrical team on custom solenoid design.
- Look at other teams for reference & inspiration.
- Compare last years design to other teams.
Chipper
- Work with electrical team on custom solenoid design.
- Look at other teams for reference & inspiration.
- CMDragons (CMU) (http://www.youtube.com/watch?v=uqLA8prsVhw)
Dribbler
- Work with software team to formulate a testing time line for last years dribblers and construct performance metrics.
- Compare last years with other teams dribblers.
- As a starting point for working with gears consult:
- 2007 TE Session Slide on Power Transmission (Pages 6, 7, 13 & 14)
- Wikipedia's Page on Gears
- WM Berg's Technical PDF on Gears (very comprehensive 40 mb +)
October 2009
Deliverables
- Omni wheel prototype (physical).
- Prototype of new gear box (CAD).
- Dimensions of kicking solenoid.
- Width, Length, Diameter of shaft.
- Performance evaluation of dribbler.
- Compare & contrast segmented vs full.
- Formulate design recommendations
Drivetrain
Omni Wheel
- Find carpet samples.
- Test last years wheels on various carpet samples.
- Develop a prototype with design changes.
- Test Prototype
Gear Box
- Look at internal gears.
- Develop CAD prototype of a new gear box.
- Constraints
- 5/16 Hex Shaft to mount wheel
- 4 mm motor output shaft
- Constraints
Kicker & Chipper
- Start meeting with electrical team on solenoid design.
- Look at Magnetic field & Electromechanical solenoids.
Dribbler
- Test current dribbler
- Receiving a pass
- Getting a stationary ball
- Design & Fabricate 2 shafts
- Full length (Note already have)
- Segmented