Difference between revisions of "RoboCupMechanicalDev2009"

From RoboJackets Wiki
Jump to navigation Jump to search
(Drivetrain)
Line 23: Line 23:
 
# Develop conclusions and recommendations based on tests conducted.
 
# Develop conclusions and recommendations based on tests conducted.
 
# As a starting point for working with gears consult:
 
# As a starting point for working with gears consult:
#: [[Image:2007_TE_Session_-_Mechanical_Power_Transmission.pdf|2007 TE Session Slide on Power Transmission]] (Pages 6, 7, 13 & 14)
+
#: [http://wiki.robojackets.org/w/Image:2007_TE_Session_-_Mechanical_Power_Transmission.pdf 2007 TE Session Slide on Power Transmission] (Pages 6, 7, 13 & 14)
 
#: [http://en.wikipedia.org/wiki/Gears Wikipedia's Page on Gears]
 
#: [http://en.wikipedia.org/wiki/Gears Wikipedia's Page on Gears]
  

Revision as of 12:37, 11 September 2008

This page houses our complete current development schedule and tasks.

September 2009

  1. Briefing of new members on 08 mechanical system.
  2. Conduct a phased maintenance and overhaul on 2008 fleet. Two robots at a time. Starting with worst condition.
    1. Disassembly and Cleaning
    2. Modifying motor shafts by putting in holes for set screws.
  3. Investigate part failures and problems.
    Omni Wheels
    1. O-ring retention on rollers.
    2. Carpet collection by omni wheels.
  4. Getting members Autodesk Inventor 2009
  5. Identify and assign subteams / subsystems
    Dribbler
    Drivetrain (Omni Wheel & Gearboxes)
    Kicker
    Chipper
    Chassis & Integration

Drivetrain

  1. Procure appropriate carpet samples.
  2. Design & Build test rig. Jack up 1 robot w/ small bocks, restrain it, and run 1 wheel on samples.
  3. Develop conclusions and recommendations based on tests conducted.
  4. As a starting point for working with gears consult:
    2007 TE Session Slide on Power Transmission (Pages 6, 7, 13 & 14)
    Wikipedia's Page on Gears

Kicker

  1. Work with electrical team on custom solenoid design.
  2. Look at other teams for reference & inspiration.
    1. CMU (http://www.youtube.com/watch?v=uqLA8prsVhw)
  3. Compare last years design to other teams.

Chipper

  1. Work with electrical team on custom solenoid design.
  2. Look at other teams for reference & inspiration.
    1. http://www.youtube.com/watch?v=uqLA8prsVhw

Dribbler

October 2009