Difference between revisions of "Jessi"

From RoboJackets Wiki
Jump to navigation Jump to search
m (Gallery)
m (Gallery)
Line 75: Line 75:
  
 
Image:Jessi.jpg | Jessi
 
Image:Jessi.jpg | Jessi
[[Image:Jessiicomp.jpg | Jessii before going to competition]]
+
[[Image:Jessiibeforecomp.jpg | Jessii before going to competition]]
 
[[Image:Jessiiteam1.jpg | Jessii team on day 1 of comp]]
 
[[Image:Jessiiteam1.jpg | Jessii team on day 1 of comp]]
 
[[Image:Jessiiqualify.jpg | Jessii after qualifying]]
 
[[Image:Jessiiqualify.jpg | Jessii after qualifying]]

Revision as of 16:44, 30 June 2019

Jessi
Year Of Creation 2017-2018
Versions
Latest Revision Jessii
Revision Years 2018-2019
Information and Statistics
Farthest Distance 16 ft
Fastest Time n/a
Highest Finish AutoNav n/a
Highest Finish Design 1st


Competitions

IGVC 2018

  • Results
    • Distance: 5 ft
    • Design Competition Placement: 2nd
    • AutoNav Competition Placement:

IGVC 2019

  • Results
    • Distance: 16 ft
    • Design Competition Placement: 1st
    • AutoNav Competition Placement:

Versions

Jessi

At Competition

Mechanical Issues & Improvements

Electrical Issues & Improvements

Jessi Electrical Overview

Software Issues & Improvements

Jessii

At Competition

Though the team was well-prepared going into 2019 IGVC, several issues came up during competition. On the first day, the mbed was experiencing issues and causing the computer to brownout. The mbed was fried while attempts were being made to fix the problem. Eventually this was solved with a new mbed and a large capacitor, which prevented brownouts from happening, though the whole process of fixing the robot took up the first day of the competition. During the second day, major progress was made; the team was 4th to qualify, which was the earliest Georgia Tech has ever qualified in IGVC. Additionally, the robot had a few successful runs on the course. Most notably, the great backwards run tragedy of 2019 happened. During this run, the robot turned itself around and went BACKWARDS on the course, though it went extremely far. This ended up being (absolute-value) the second longest run achieved by any robot in the competition this year, though it didn't count towards our score since it was backwards.

Mechanical Issues & Improvements

Electrical Design & Improvements

For Jessii, the electrical team focused on iterating on several components of Jessi's system to improve weaknesses seen at the prior competition.

  • Custom Computer and Improved Sensors
    • To improve computational capabilities and performance we upgraded our computer and other sensors
      • Intel i7-8700K 3.7GHz 6 Core Processor, Nvidia GTX 1060 GPU, 32GB RAM
        • GPU was chosen for CUDA support
        • Hotswap capability was brought using a PCB though not implemented before competition
      • Velodyne Puck VLP-16 3D LiDAR
      • YostLabs 3-Space Micro USB IMU
  • E-Stop
    • E-Stop circuitry was consolidated onto E-Stop PCB
    • Relay was used instead of a transistor used in version 1.0
  • Ethernet Communication Protocol
    • The logic board, the custom PCB which handles motor control switched from a virtual serial interface from MBed to a custom Ethernet communication protocol for robustness

Software Issues & Improvements

Additional Information

Team Members

Gallery

Image:Jessi.jpg | Jessi

Error creating thumbnail: /usr/bin/timeout: the monitored command dumped core /var/www/mediawiki/includes/shell/limit.sh: line 101: 19579 Aborted /usr/bin/timeout $MW_WALL_CLOCK_LIMIT /bin/bash -c "$1" 3>&- Error code: 134

Jessii team on day 1 of comp

Error creating thumbnail: /usr/bin/timeout: the monitored command dumped core /var/www/mediawiki/includes/shell/limit.sh: line 101: 19590 Aborted /usr/bin/timeout $MW_WALL_CLOCK_LIMIT /bin/bash -c "$1" 3>&- Error code: 134

Jessii team after qualifying Jessii team reunites with Ford alumni

Error creating thumbnail: /usr/bin/timeout: the monitored command dumped core /var/www/mediawiki/includes/shell/limit.sh: line 101: 19599 Aborted /usr/bin/timeout $MW_WALL_CLOCK_LIMIT /bin/bash -c "$1" 3>&- Error code: 134

Jessii testing during comp at night Jessii design 1st place certificate