File list
From GT RoboJackets
This special page shows all uploaded files. By default the last uploaded files are shown at top of the list.
A click on a column header changes the sorting.| Name | User | Size | Description | Versions | |
|---|---|---|---|---|---|
| 23:20, 21 September 2011 | BB11Team.JPG (file) | Jmazaira | 6.06 MB | 1 | |
| 00:33, 21 September 2011 | BB2011Team.jpg (file) | Jmazaira | 6.05 MB | 1 | |
| 00:27, 21 September 2011 | 2011BBGannt.png (file) | Jmazaira | 229 KB | 1 | |
| 00:28, 19 September 2011 | IGVC_2012_Gantt.png (file) | Jhickey | 196 KB | (Reverted to version as of 03:50, 6 September 2011) | 2 |
| 22:29, 18 September 2011 | P4152102.jpg (file) | Jmazaira | 223 KB | 2 | |
| 03:22, 10 September 2011 | IGVC_2011.JPG (file) | Jhickey | 1.82 MB | (The official team picture of the 2011 RoboJackets IGVC team.) | 1 |
| 21:19, 4 September 2011 | Piezo-trace.png (file) | Aloishis89 | 23 KB | 1 | |
| 15:54, 30 September 2010 | TrainingSchedule.PNG (file) | StoianB | 14 KB | (This is the current planned schedule for member training for the fall 2010 semester.) | 1 |
| 03:51, 5 September 2010 | RoboJackets-TEAM-Budget-Proposal.zip (file) | Stefan | 328 KB | (Files for team budgets) | 1 |
| 04:18, 21 June 2010 | RC2009ChipperKickerRender.jpg (file) | Stefan | 156 KB | 2 | |
| 01:24, 6 April 2010 | RJShirtBack.jpg (file) | Stefan | 2.08 MB | (2010 back) | 2 |
| 01:23, 6 April 2010 | RJShirtFront.jpg (file) | Stefan | 254 KB | (2010Shirt) | 2 |
| 03:11, 10 March 2010 | FAPSchedule-03-22.png (file) | AndyB | 108 KB | (FAP Schedule) | 1 |
| 03:05, 10 March 2010 | FAP_software_overview.png (file) | PaulV | 26 KB | 1 | |
| 17:43, 6 March 2010 | AndroidSerialPort.png (file) | PaulV | 19 KB | 1 | |
| 15:37, 4 March 2010 | BrianOuellette.jpg (file) | BrianO | 16 KB | 1 | |
| 04:15, 15 February 2010 | RJRC_2010_TDP.pdf (file) | AndyB | 3.93 MB | 1 | |
| 20:18, 11 November 2009 | TE_2009_lv_sens.pdf (file) | AndyB | 1.99 MB | (Reverted to version as of 20:18, 11 November 2009) | 3 |
| 20:16, 11 November 2009 | TE_2009_lv_line.pdf (file) | AndyB | 227 KB | (Reverted to version as of 20:15, 11 November 2009) | 4 |
| 20:14, 11 November 2009 | TE_2009_lv_manip_II.pdf (file) | AndyB | 458 KB | 3 | |
| 19:57, 11 November 2009 | TE_2009_lv_final.pdf (file) | AndyB | 5.24 MB | 1 | |
| 20:44, 20 October 2009 | TE_2009_eagle_handout.pdf (file) | PaulV | 734 KB | 1 | |
| 20:44, 20 October 2009 | TE_2009_eagle_slides.pdf (file) | PaulV | 534 KB | 1 | |
| 04:38, 14 October 2009 | Gfa.avi (file) | Stuart | 1.19 MB | (test avi file) | 1 |
| 03:13, 14 October 2009 | TE2009-Robot-Arm-Simulation.avi (file) | Stefan | 6.13 MB | (Modelica simulation in the Dymola software (by Dassault Systemes)) | 1 |
| 19:31, 13 October 2009 | TE_2009_Cvision_slides.pdf (file) | AndyB | 5.45 MB | 1 | |
| 19:11, 13 October 2009 | TE_2009_lv_manip_ho.pdf (file) | AndyB | 2.56 MB | 1 | |
| 19:09, 13 October 2009 | 2009_Lv_manip_slides.pdf (file) | AndyB | 4.06 MB | (LV_manip_slides) | 1 |
| 19:07, 13 October 2009 | Tetrix_drive.zip (file) | AndyB | 6 KB | 1 | |
| 08:34, 13 October 2009 | Lv_into_mot.zip (file) | AndyB | 5 KB | 1 | |
| 08:29, 13 October 2009 | 2009_TE_Session_-_Teacher_Meeting.pdf (file) | AndyB | 421 KB | 1 | |
| 08:26, 13 October 2009 | LV2009_mot_intro.pdf (file) | AndyB | 1.94 MB | 1 | |
| 08:25, 13 October 2009 | Updating-NXT-Firmware.pdf (file) | AndyB | 230 KB | (Updating NXT Firmware) | 1 |
| 08:24, 13 October 2009 | LV2009_install.pdf (file) | AndyB | 41 KB | (How to install LV 2009) | 1 |
| 08:22, 13 October 2009 | 2009_TE_Session_-_Mech_Power_Transmission.pdf (file) | AndyB | 2.34 MB | 1 | |
| 08:20, 13 October 2009 | 2009_TE_Sessions_Intro.pdf (file) | AndyB | 2.91 MB | 1 | |
| 21:20, 29 September 2009 | ControlsPlotter.zip (file) | PaulV | 8 KB | 1 | |
| 17:00, 25 September 2009 | Battlebots-schematic1-med.jpg (file) | Aloishis89 | 63 KB | 1 | |
| 16:39, 25 September 2009 | Bambii-09-small.jpg (file) | Aloishis89 | 64 KB | 1 | |
| 16:38, 25 September 2009 | Bambii-09-med.jpg (file) | Aloishis89 | 179 KB | 1 | |
| 16:36, 25 September 2009 | Bambii-09.jpg (file) | Aloishis89 | 305 KB | (The Battle scarred Bambii after competition in 2009.) | 1 |
| 23:12, 24 September 2009 | 250015.pdf (file) | Aloishis89 | 125 KB | (Specs for the battery packs used in battlebots.) | 1 |
| 23:12, 13 September 2009 | RoboJackets_Brochure-sm.pdf (file) | Stefan | 1.57 MB | 1 | |
| 07:20, 3 September 2009 | TE_Sessions_2009_Announce_Final.pdf (file) | Stefan | 303 KB | 1 | |
| 02:58, 31 August 2009 | Lol-slad.png (file) | User test | 49 KB | (Testing png thumbs) | 1 |
| 04:13, 28 August 2009 | 2009_Intro_Meeting_Presentation.pdf (file) | Stefan | 1.22 MB | 1 | |
| 03:14, 28 August 2009 | Inv_assembly_win.jpg (file) | Stefan | 88 KB | 1 | |
| 03:10, 28 August 2009 | Inv_assembly_6.jpg (file) | Stefan | 302 KB | 1 | |
| 03:09, 28 August 2009 | Inv_assembly_5.jpg (file) | Stefan | 324 KB | 1 | |
| 03:09, 28 August 2009 | Inv_assembly_4.jpg (file) | Stefan | 301 KB | 1 |
![]() First page |
![]() Previous page |
![]() Next page |
![]() Last page |



